Project Description:
Los Alamos National Laboratory, Los Alamos, NM
Scope of Work
Design and construction support services for Chiller #1 Replacement Project consisting of the complete removal of the last remaining original chiller from the HVAC equipment room, removing and resizing existing chilled water piping as required by design, instrumentation and controls, electrical and structural engineering. In addition, replacement of four existing chilled water pumps and associated piping and electrical service to the computer room to serve Power Distribution Units (PDUs) on the floor was included.